Kvalitetskontrol & <span class ="tr_" id="tr_2" data-source="" data-srclang="en" data-orig="Equipment Testing | Mico Aes">Equipment Testing | Mico Aes</span>
Quality control & equipment testing

Tested before it leaves our facility.

Every Mico Aes aesthetic machine is inspected and functionally tested before shipment.

Our quality control process covers key components, assembly, system functions, treatment handpieces, cooling performance, operating stability, final appearance, accessories, and export packaging.

Our goal is simple: identify potential issues before the equipment leaves our facility and provide customers with greater confidence in the equipment they receive.
Quality control from components to shipment

Quality control is not a single inspection at the end of production.

Our process includes multiple inspection and testing stages throughout assembly, final testing, and preparation for shipment.

01

Incoming Component Inspection

Quality control begins with the components used to build the equipment.

  • Specifications and condition
  • Compatibility and visible defects
  • Components checked before or during assembly
02

Assembly Inspection

During assembly, technicians check connections, component installation, internal structure, cables, tubing, connectors, and other key assembly points.

03

Functional Testing

After assembly, the equipment is powered on and its main functions are tested before final inspection.

01 / Incoming component inspection

Quality starts with the components used to build the equipment.

Depending on the machine, key components and parts are checked before or during assembly for specifications, condition, compatibility, and visible defects.

  • Power supplies
  • Control boards
  • Viser
  • Pumps and cooling components
  • Laser components
  • RF components
  • Treatment handpieces
  • Connectors and cables
  • Water circulation components
  • Machine housings and structural parts

Components that do not meet applicable requirements are not used for normal production.

02 / Assembly inspection

Assembly points are checked before functional testing.

Inspection items vary according to the equipment technology and configuration. Typical checks include:

  • Internal electrical connections
  • Water tubing and circulation connections
  • Handpiece connectors
  • Power connections
  • Control boards
  • Cooling components
  • Internal component installation
  • Housing assembly
  • Screen and control-panel installation

This helps identify assembly-related issues before the machine enters functional testing.

03 / Functional testing

System functions are checked after assembly.

Depending on the model, testing may include the following functions and operating controls.

  • System startup
  • Touchscreen operation
  • Software functions
  • Parameter adjustment
  • Behandlingsmåder
  • Handpiece recognition
  • Footswitch operation
  • Emergency stop
  • Water circulation
  • Køling
  • Alarms and safety functions
  • Accessories and connections

The objective is to confirm that the machine and its main operating functions work correctly before final inspection.

Performance testing by technology

Different aesthetic technologies require different testing procedures.

We test applicable functions according to the equipment type rather than using one identical test for every machine.

LASER

Laser System Testing

  • Laser output operation
  • Energy adjustment
  • Frequency adjustment
  • Treatment handpiece operation
  • Spot output
  • Cooling performance
  • Water circulation
  • Temperaturovervågning
  • Touchscreen controls
  • Safety functions
RF

RF System Testing

  • RF energy delivery
  • Energy adjustment
  • Behandlingsmåder
  • Handpiece operation
  • Tip or cartridge recognition
  • Temperature-related functions
  • Cooling functions
  • Screen and software controls
  • Safety functions
HIFU

HIFU System Testing

  • Handpiece operation
  • Cartridge recognition
  • Shot delivery
  • Energy adjustment
  • Treatment depth selection
  • Line or dot operation
  • Cartridge communication
  • Screen controls
  • Applicable safety functions
Ems

HIFEM / EMS System Testing

  • Applicator recognition
  • Energy/intensity adjustment
  • Frequency settings
  • Behandlingsmåder
  • Simultaneous applicator operation
  • RF heating functions where applicable
  • Temperature-related functions
  • Screen controls
  • Applicator connections

Cooling System Testing

Cooling performance is particularly important for many professional aesthetic systems. Depending on the machine, we check applicable cooling functions. Cooling configurations vary by product and technology.

  • Water circulation
  • Luftkøling
  • Semiconductor / TEC cooling
  • Kontakt afkøling
  • Handpiece cooling
  • Water-flow detection
  • Temperaturovervågning
  • Cooling alarms
04 / Handpiece & applicator testing

Critical treatment components are connected and tested.

Treatment handpieces are critical working components of professional aesthetic equipment. Applicable handpieces and applicators supplied with the order are connected and tested before shipment.

  • Connection
  • Recognition
  • Parameter control
  • Energi levering
  • Køling
  • Buttons and controls
  • Behandlingsmåder
  • Applicable temperature functions
  • Visible condition

This is especially important for systems supplied with multiple handpieces or treatment applicators.

05 / Stability & aging test

Selected equipment is operated and monitored before final packing.

Testing helps identify potential issues that may not appear during a short startup test.

  • Main system
  • Treatment handpieces
  • Kølesystem
  • Water circulation
  • Vise
  • Power system
  • Behandlingsmåder

Testing duration and procedures vary according to the machine type and production requirements.

06 / Final inspection

Before packing, the machine receives a final inspection.

Customized orders are also checked against the confirmed order configuration.

Maskine

  • Housing condition
  • Screen condition
  • Buttons and switches
  • Wheels and structure
  • Connectors
  • Labels
  • Logo and customization

Håndstykker

  • Correct quantity
  • Correct configuration
  • Physical condition
  • Forbindelser
  • Applicable functional checks

Tilbehør

  • Strømkabel
  • Footswitch where applicable
  • Protective eyewear where applicable
  • Treatment accessories
  • Consumables included with the order
  • User documentation
07 / Pre-shipment machine testing video

Review applicable machine functions before shipment.

For applicable orders, a machine testing video can be recorded before shipment.

  • Machine startup
  • Brugergrænseflade
  • Included handpieces
  • Basic machine functions
  • Selected treatment modes
  • Cooling or water circulation where applicable
  • Tilbehør
  • Machine appearance

For customized orders, relevant customization details can also be shown where practical. This gives customers an additional opportunity to review their equipment before shipment.

08 / Packaging inspection

Equipment is prepared for international transportation.

Professional aesthetic equipment requires appropriate protection during international transportation.

Before shipment, we check the machine and accessories against the order and prepare them for transport.

Depending on the machine and shipping method, packaging may include:

  • Beskyttende skum
  • Reinforced outer packaging
  • Protective wrapping
  • Accessory compartments
  • Export-grade flight cases for applicable equipment

The objective is to reduce movement and protect the equipment during international transportation.

09 / Ready for shipment

Inspection, testing, verification and packaging completed.

After inspection, testing, order verification, and packaging are completed, the equipment is prepared for shipment.

  • Destination country
  • Equipment size and weight
  • Shipping method
  • Customer requirements
  • Available customs and delivery options

Customers can request available shipping information before placing an order.

Quality control for customized & OEM orders

Customer-specific requirements are included in the final inspection.

OEM and private-label orders require additional checks because the final equipment may include customer-specific elements.

Customer logo Machine color Startup screen Software language Brugergrænseflade Labels Emballage Manualer Tilbehør Product configuration

Customization requirements are reviewed as part of the final order inspection.

The confirmed customization requirements are reviewed as part of the final order inspection.

Why pre-shipment testing matters

Quality is a complete system, not a single specification.

Professional aesthetic equipment contains multiple electronic, mechanical, cooling, software, and treatment components.

A structured pre-shipment inspection process helps identify issues before international delivery and verifies that the supplied configuration matches the confirmed order.

  • Equipment specifications
  • Component quality
  • Uddannelse
  • Garanti
  • Spare parts
  • Technical support
  • Maintenance requirements

For professional buyers, quality control should be considered together with:

Equipment quality is not defined by a single specification. It depends on the complete system and the support available throughout its working life.

Indkøbskurv
Rul til toppen